Fernebo Bloggen

sk3w.se

Entries Comments



SK3W 3.0 progress

10 August, 2010 (09:47) | Shack | By: sm3sgp

Yesterday the shack was completely shut down. SM3XLY Erik and SE3K Dan helped all day, and we disconnected and packed all the equipment. Then we stared to build the first operating positions, no radios yet, but computers.

Some metal work was done, in the non-existing workshop, cutting aluminium and drilling holes for coax connectors. Next step will be to connect the trunk cables between each operation position in the the other room.

Dan and me was also tightening the guy wires on the Ericsson tower.

COAX cross-connectSE3K after work has finnishedThe new tableXLY and SE3K

Write a comment