5 November, 2011 (22:34) | Tower | By: sm3sgp

Today SM3XIK Anderas and I worked at the station. The driven element was cut, and prepared for lifting. The 4 element 20 meter yagi on the ground, was was adjusted and some rope was put inside the 12mm tips of the elements. At night we made some electrical work in the new work shop.

Tomorrow we we continue to lift cables and the driven element.

Second try to cut it straight...Split driven element 40m. Upsidedown...Split driven element 40m. Upsidedown...